~ China Carbon Steel Casting, Alloy Steel Casting, Stainless Steel Casting (Cast Steel)
- Chinese Supplier ~
Product images of steel casting (cast steel)
 |
 |
 |
 |
 |
 |
Carbon Steel Casting |
Alloy Steel Casting Link |
Alloy Steel Casting |
Carbon Steel Casting |
Alloy Steel Casting Ring |
Stainless Steel Casting |
- Material:
- Carbon
Steel: JIS
Such as SC450, SCC5 / DIN GS-45,
GS-60 / ASTM 450-240, 80-40, WCB
- Alloy
Steel:
JIS SCW480, SCSiMn2, SCCrMn3
/ DIN GS-20Mn5, GS-37MnSi5,
GS-34CrMo4
- Heat
Resistant Steel: JIS
SCH / DIN G-X30CrNiSi25-12 /
ASTM HH
- Stainless Steel: JIS SCS1, SCS2, SCS13, SCS14 / DIN G-X7Cr13, G-X20Cr14, G-X6CrNi18 9, G-X6CrNiMo18 10 / ASTM CA-15, CA-40, CF-3, CF-8M, etc
- Other
materials also available according to customer's request.
- Required documents for offer to be provided by customer:
- Drawings with formats of IGS (3D), DWG or DXF (Auto CAD 2D), PDF, JPG and
- Standard of material (Preferable to provide Element Percentage of C, Si, Mn, P, S, etc and Physical/Mechanical Properties of the material) and
- Technical requirements and
- Piece Weight of Rough Casting
- Production technology:
Sand casting
- Main production equipment:
- Intermediate frequency electrical induction furnaces and electrical
arc furnaces (EAF)
- Heat treatment (Annealing) furnaces
- Shot blast machines
- Equipment
for inspecting chemicals and physical properties
- Ultra sonic inspector
- Pin
holes and cracks inspection with magnetic powder
- Piece weight:
2Kg~2,300Kg per piece
- Finish Machined/tooled
products also available according to customer's request (Drawings and standard
of products should be provided by customer.)
- Production capacity:
500 Mt per month
- Duration of pattern-making: Within 45 working days (Vary subject to the complexity of products)
- Delivery:
Within 45 working days after signing of contract and confirmation of samples
by client
Home Page
Material
Product
Sundry
Other